A crew from Wright Construction Company works Monday, April 25, 2022, to replace beams on the Lincoln Covered Bridge in West Woodstock, Vt. The bridge was damaged in September, 2021, when a truck towing heavy equipment that exceeded the posted height limit of 10 feet struck over head beams. In a similar incident in 2019, a truck towing a backhoe through the bridge caused roughly $1 million of damage. (Valley News - James M. Patterson) Copyright Valley News. May not be reprinted or used online without permission. Send requests to permission@vnews.com.
A crew from Wright Construction Company works Monday, April 25, 2022, to replace beams on the Lincoln Covered Bridge in West Woodstock, Vt. The bridge was damaged in September, 2021, when a truck towing heavy equipment that exceeded the posted height limit of 10 feet struck over head beams. In a similar incident in 2019, a truck towing a backhoe through the bridge caused roughly $1 million of damage. (Valley News - James M. Patterson) Copyright Valley News. May not be reprinted or used online without permission. Send requests to permission@vnews.com. Credit: Valley News โ€” James M. Patterson