• gasenergyStandalone-jmp-vn-092424,ph01
  • gasenergyStandalone-jmp-vn-092424,ph02
  • gasenergyStandalone-jmp-vn-092424,ph03
  • gasenergyStandalone-jmp-vn-092424,ph04

Twenty years after the project to burn methane gas produced in the Lebanon landfill to generate electricity was conceived, installation of equipment is underway to clean and burn methane gas, a byproduct of decomposing waste in the landfill. Expected to be in use by the end of the year, the 1-megawatt system should produce enough electricity to offset the needs of all of Lebanon’s city-owned buildings.

โ€” James M. Patterson